Mat-8: Design for Disassembly
Product is likely to assist in a project obtaining credit as it
helps minimise the embodied energy and resources associated with
demolition. Credit point is awarded where 50% (by area) of
structural framing, roofing, facade and cladding systems are
designed for disassembly or where 95% of total facade is designed
for disassembly. If materials above represent less than 1% of the
projects contract value this credit is not applicable.
|
Points Available
1
|