Man-2 Note 1: Commissioning Clauses
To obtain these credit points the project must implement
commissioning and handover initiatives to ensure that building
services are operated to optimal design potential.
Pre-commissioning, commissioning and quality monitoring are
required for all building services (BMS, mechanical, electrical,
hydraulic).
An additional point is awarded where the above is achieved and
project knowledge is transferred to the building owner/manager
through all of the following - documented design intent, as-built
drawings, Operations and Maintenance Manual, Commissioning report
and training of building management staff.
Product may contribute individually or in combination with
other products/systems in facilitating transfer of knowledge for
measurement, monitoring, building information technology systems,
communication and training as required for the additional
point.
|