Man-2 Note 1: Commissioning Clauses

Man-2 Note 1: Commissioning Clauses

To obtain these credit points the project must implement commissioning and handover initiatives to ensure that building services are operated to optimal design potential. Pre-commissioning, commissioning and quality monitoring are required for all building services (BMS, mechanical, electrical, hydraulic).

An additional point is awarded where the above is achieved and project knowledge is transferred to the building owner/manager through all of the following - documented design intent, as-built drawings, Operations and Maintenance Manual, Commissioning report and training of building management staff.

Product may contribute individually or in combination with other products/systems in facilitating transfer of knowledge for measurement, monitoring, building information technology systems, communication and training as required for the additional point.

Points available

2